Institute of High Energy Physics,Chinese Academy of Sciences
Chinese Version | Home | Contact Us
Introduction
About IHEP
Directors
CAS Academicians
Chronicle of events
Talents Brought In By IHEP
Returned Experts from overseas
Annual Report
Pictures
IHEP News
Conference
Research Facilities
Beijing Electron Positron Collider
Beijing Spectrometer
Synchrotron Radiation Facility
Beijing Proton Linac
Beijing Free Electron Laser
Test Beam
Yangbajing Cosmic Ray Observatory
Collaborations
Links
SLAC FNAL BNL
LBL CESR ANL
CERN DESY INFN
KEK Interactions.org
NSF
Data Acquisition for This Run Accomplished (090812)
Seminar For Strategic Planning(090731)
BEPCII National Acceptance Test Passed(090720)
16th Real Time Conference Held at IHEP(09/06/24)
CAS Technical Appraisal Passed (09/06/15)
PSI Delegation Visited IHEP(09/05/25)
BEPCII Storage Ring Pre-tested(09/05/22)
BEPCII Luminosity Reached Acceptance Specifications(09/05/13)
Mr. Lu Yongxiang Met with Dr. Rolf-Dieter Heuer(09/05/04)
Mr. Cao Jianlin Met with Dr. Rolf-Dieter Heuer(09/04/29)
First e+e- Collison at BEPCII/BESIII(08/07/22)
CEA Guests Visit IHEP (08/05/30)
BMBF Delegation visits IHEP(08/04/16)
TBF Stops Running for Upgrade(08/04/09)
CEA Top Leader Calls On IHEP(08/03/28)
Mini-Workshop on BEPCII Background(08/03/21)
DESY Guest Calls on IHEP(08/03/12)
Successful Detector Data Acquisition(08/02/25)
Second phase commissioning of the BEPCII completed with success(08/02/04)
X-Ray Spectrometer aboard Chang'e-1 Satellite Works Well(07/12/04)
Successful Collision Realized in the Second Stage of BEPCII Commissioning(07/11/21)
Daya Bay Reactor Neutrino Experiment to Celebrate Groundbreaking(07/10/15)
In Memoriam: Pief Panofsky(07/09/26)
CAS Theoretical Physics Research Center for Mega-Science Facilities Launched(07/09/14)
Tumor Nanotechnology Research Center established in Tianjin(07/09/05)
BEPC Annual Meeting in Qingdao(07/08/20)
Join Hands Tackling Cancer (07/08/17)
A new Resonant-Structure and a new Enhanced-Structure (07/08/17)
Small Angle X-ray Scattering (SAXS) Station Put into Operation(07/07/24)
Final Assembly of BESⅢ Barrel EMC Accomplished(07/07/23)
100mA*100mA Beam Collision Achived on BEPCII(07/05/18)
“France-China Particle Physics Laboratory”Created(07/05/15)
Birth of Dongguan Neutron Science Center(07/05/09)
The 18th ICANS meeting held in Dongguan, Guangdong, China(07/05/09)
The First International Advisory Committees Review on CSNS(07/05/09)
Beam Intensity Continues Going Up(06/12/06)
BEPCII Beam-tuning Goes Fine(06/12/01)
XXVIIth Meeting of PRC/U.S. Joint Committee on High Energy Physics Held in Beijing(06/11/21)
Quick Progress of BEPCII Commissioning(06/11/20)
Beams Successfully Accumlated in the Storage Ring of BEPCII(06/11/20)
Installation of Vacuum Chamber Started(06/10/31)
Magnets Installation at Interaction Region Completed(06/10/31)
Magnets Installation Started on West Side of BEPCII Interaction Region(06/10/19)
Magnets Installation Started on East Side of BEPCII Interaction Region(06/10/17)
Biggest Super-conducting Solenoid Magnet in China Successfully Developed at IHEP(06/09/21)
Installation of SR Magnets Completed(06/09/12)
West Super-conducting RF Cavity at BEPCII Successfully Installed(06/09/08)
Magnets successfully installed in BEPCⅡStorage Ring(06-08-07)
BEPCII RF Cavity Waveguide Aging Finished(06-08-01)
BESIII MDC Electronics Mass Production and Tests Unveiled(06-07-14)
Central Carpet of YBJ-ARGO Experiment Hailed Completion(06-07-12)
First BEPCII Super-conducting RF Cavity Passed RF Power Test(06-07-05)
BEPCII Special Magnets passed Acceptance Test(06-06-28)
Progress Towards New BEPC(06-03-14)
A New Particle Observed at BESII(06-01-18)
BESIII Mechanical System Passed Acceptance Test(05-12-23)
Superconducting Magnet Girder Successfully Installed(05-12-12)
BESIII Muon System Successfully Installed(05-10-31)
Agreement Signed between IHEP and TIPC(05-08-24)
BEPC Storage Ring Dismantled(05-08-17)
Wiring Started(05-08-12)
Second Phase of BEPCII under Full Swing(05-07-05)
Successful BESIII Performance Measurements(05-07-04)
New Control System for ID4W1 Power Supply Accomplished(05-07-01)
BESIII Mechanical System Passed Pre-Acceptance(05-06-13)
BSRF Double Crystal Monochromater Beamline Accepted(05-04-25)
A Successful Positron Source Commissioning!(05-03-25)
First Phase of BEPCII Successfully Completed- BSRF Running Resumed(05-01-18)
Unite as One, Strive for More Achievements in 2005 Remarks from the Director
Phased Progress Made in Upgrading BEPC-- Installation and Commissioning of Electron Linac Completed(04-11-22)
Major Upgrade of BEPC Carried Out in An All Round Way (04-01-16)
A New Particle Discovered At BES/BEPC (03-07-31)
Video Conference Held for BEPCII Engineering Design(03-05-22)
Data Acquisition Plan Successfully Accomplished(03-05-20)
Collaborative Efforts on CMS Detector Crowned with Success(03-05-20)
BEPC II Approved by the State Council(03-02-26)
Vice Premier Wen Jiabao Meets with U.S. Delegation to 23rd Meeting of PRC/US Joint Committee on High Energy Physics(02-10-30)
Mid-term Evaluation of OIHERS Crowned with Success(02-08-22)
Literacy of Accelerator Applications Promoted(02-08-19)
Much Headway Made in Nano Study by SR Lab(02-08-13)
Exciting News from the Experimental Physics Center (EPC)(02-08-12)
11th International BES Annual Meeting Successfully Held(02-07-22)
Questions and Comments to webmaster@ihep.ac.cn
Copyright: Institute of High Energy Physics , Chinese Academy of Sciences
mailing address:19B YuquanLu, Shijingshan District, Beijing, 100049
FAX: 86-10-88233374 TEL: 86-10-88233093
Updated: 09-08-12