Mini-Workshop on

 

BEPCII Background Study

 

 March 10 - 12, 2008, in IHEP, Beijing, China

 

 

 
Purpose
About BEPCII
About BESIII
Program
Participants
Transportation &
Accommodation
Indico Tool
About Beijing
Internet Service
 

 

                                          

About BEPCII

As a natural extention of the Beijing Electron Positron Collider (BEPC), the BEPCII will operate in the beam energy region of 1.0-2.1 GeV so that its physical potential in the whole t and charm range is preserved. As the physics is concentrated at the J/y (3097), y(3686), and y(3770), the collider is optimized at 1.89 GeV. In order to obtain a high duty factor of the collision, the injection time should be shorter than half an hour. The injector should be capable of the full-energy topoff injection up to 1.89 GeV, and the positron injection rate should be higher than 50 mA/min. As the machine will also be operated as a SR source, the upgrade of the collider should also provide an improved SR operation performance with higher beam energy and intensity, i.e. 250 mA at E = 2.5 GeV. Layout of the BEPCII is shown in the following figure and its design goals are listed in the table below.

Design goals of the BEPCII

Beam energy range

 1-2.1 GeV

Optimized beam energy region

1.89 GeV

Current of each beam in collision

0.93 A

Design luminosity

1 ´10 33 cm-2s-1 @189 GeV

Beam lifetime

2.7 hrs.

Injection from linac

Full energy injection: Einj = 1.55-1.89GeV

Positron injection rate >50 mA/min

Dedicated SR operation

250 mA @ 2.5 GeV